Kamis, 02 April 2015

My Hobbies

DRUM


My hobby is playing Drum. Starting from gratitude , a hobby that can be able to make me feel happy is playing drum. Main components present in the drum is :
1. Snare Drum
2. Bass Drum
3. Tom - Tom
4. Hi - Hat Cymbal
5. Ride Cymbal
6. Crash Cymbal
While playing drums that must be considered is tempo , feel, and power. When it is mastered it can be combined with variation and improvisation.
Erlier in 2008, with the vision and missi of the equation to create work that could produce a stream of new music and able to give a new color in country music, they from "JansenLaura - (JL)" whih carries of the Brirish Groove.



(JL Cover)


(JL Cover)


(JL Cover)


(JL Song Album)




PREAPARATON

(Prepare before recording

)

(Prepare before recording)



PERFORM

(Perform Style)

(Perform at Surabaya)


(Perform at LA Lights Start Up)


(Perform at LA Lights Start Up)




APPRECIATION



















Minggu, 20 April 2014

Singapore Theme

HOLIDAY

In March 2012, Begins with the landing at Changi Airport, the airport is located in the Changi area at the east end of the island of Singapore and it is one of the best aviation facilities in Asia and the world.


"Changi Airport"


I have plan for a vacation exactly in Singapore. Why I choose Singapore, because there are several factors which I will explain.

1. Singapore is included in the list of 20 smallest countries in the world.
2. Merlion become a symbol of Singapore. "Mer" which means the sea is described by the shape of fish to symbolize the origins of Singapore as a fishing village. "Lion" or lion is taken from the name that means lion city of Singapore.
3. Singapore recorded as one of the most populous countries in the world. Singapore population density is approximately 6,340 persons per square kilometer.
4. Singapore became the biggest exporter of ornamental fish in the world. Approximately 25% of the world supply of ornamental fish from Singapore.
5. Singapore is actually an archipelago consisting of one main island and 63 small islands. Largely uninhabited island in Singapore.
6. Because of the narrowness of Singapore, most of the population live in apartments or flats. The survey results prove that 9 out of 10 Singapore residents live in high rise buildings.
7. Singapore became the home of the first night zoo in the world, Night Safari. Trends safari nights later followed by many other countries around the world.



"Merlion Statue"


That is some factors that I can say,may be every person has a different point of view. But, as long as I was in Singapore, I really admire of discipline rules applicable in the area. For example, at the time wanted to ride the train, each location listed definitely plan on traveling to facilitate flow for visitors to enjoy the journey.



"At The Train"


During at Singapore, I invited my father to enjoy the holiday trip. Because my parents are everything, don't forget to always ask for her pleasure. So, do your best to your parents, as long as you can and can be with you. 



"With My Father"


There are some places I visited while in Singapore, for the example is Marina Bay Hotel. Most recent at Singapore and the region where the "IT", Marina Bay or the Esplanade is a waterfront location just north of the mouth of the Singapore River in downtown Singapore.



"Marina Bay Hotel"


And Marina Bay Sands. Marina Bay Sands is an integrated entertainment center, overlooking the Marina Bay at Singapore. Developed by Las Vegas Sands, and is the single most expensive investment at the world at a cost of $ 8 billion.



"Marina Bay Sands"







Jumat, 18 April 2014

Project During My Work in PT. Caputra Mitra Sejati (Shipyard & Shipbuilder)

PROJECT

In 2011 :

MT. BAHARI JAYA LESTARI (BJL)
Principal Dimensions
Length Over All (LOA) : 49.07 M
Length Of Perpendicular : 44.26 M
Breadth (B) : 12.00 M
Depth (H) : 3.70 M
Draft (T) : 2.50 M
Class : Biro Klasifikasi Indonesia (BKI)

The first time sign in this company, first project that I deal with are 1 Unit MT. Bahari Jaya Lestari, owner by PT. Segara Laju Perkasa. This type tanker ship. Use 2 Main Engnies 430 BHP, rate out put 440 PS / 2170 min and use Gear Box marine type, gear ratio 5.15:1 Much information to be learned here, especially the hull construction  is the initial step I need to understand. Overall material use carbon steel.



"MT. BAHARI JAYA LESTARI (BJL)"



PAN MARINE 12 & 14 (PM 12 & 14)
Principal Dimensions
Length Over All (LOA) : 35.10 M
Length Water Line (LWL) : 31.75 M
Length Of Perpendicular : 30.80 M
Breadth (B) : 7.00 M
Depth (H) : 3.40 M
Draft (T) : 1.35 M
Class : Bureau Veritas (BV)

The next project that I deal with are 2 Unit Crew Boat Ship Pan Marine 12 & 14, Owner by. PT. Pan Maritime Wira Pawitra. Each vessel using 3 Main Engines 1300 HP and 2 Auxiliary Engine 60 kVA. All boat construction is made of aluminum material.




"Pan Marine 12 (PM 12) at Workshop2"





"Pan Marine 12 (PM 12)"




"Pan Marine 14 (PM 14) at Workshop2"



"Pan Marine 14 (PM 14)"


In 2012 :

Wave Piercing Catamaran (WPC) Passenger Ferry QUICKSILVER IX
Principal Dimensions
Length Over All (LOA) : 42.00 M
Length Water Line (LWL) : 38.19 M
Breadth (B) : 15.60 M
Depth (H) : 4.55 M
Draft (T) : 1.40 M
Class : Lloyd's Register (LR)


The next project that I deal with are 1 Unit WPC. Catamaran Ship QUICKSILVER IX, Owner by PT. Caputra Mitra Sejati. Vessel using 4 Water Jet  Kamewa 50A3, 4 Main Engines CAT C32 1081 kW, 4 Gear Box ZF3050 ratio 1.8:1 and 2 Auxiliary Engnies 125 kVA. All vessel construction is made of aluminum material. Perform calculations about Bill of Material and Bill Of Quantity.



"Front Right View Catamaran Quicksilver IX (QS IX)"


"Side View Catamaran Quicksilver IX (QS IX)"


"Front Left View Catamaran Quicksilver IX (QS IX)"


"Back View Catamaran Quicksilver IX (QS IX)"


In 2013 :

PAN MARINE 18 & 19 (PM 18 & 19)
Principal Dimensions
Length Over All (LOA) : 50.00 M
Length Water Line (LWL) : 43.50 M
Length Of Perpendicular :  41.96 M
Breadth (B) : 9.30 M
Depth (H) : 4.125 M
Draft (T) : 1.90 M
Class : American Bureau of Shipping (ABS)

The next project that I deal with are 2 Unit Crew Boat Ship Pan Marine 18 & 19, Owner by. PT. Pan Maritime Wira Pawitra. Each vessel using 3 Main Engines 6600/5500 BHP x 1800 rpm and Gear Box ZF 7600 A. All boat construction is made of aluminum material.




"Pan Marine 18 & 19 (PM 18& 19) at Workshop 1"



"Pan Marine 18 (PM 18)"


"Pan Marine 18 (PM 18)"



"Pan Marine 19 (PM 19)"


"Pan Marine 19 (PM 19)"



"Pan Marine 18 & 19 (PM  18 & 19)"



In 2014 :

Kapal Patroli Cepat 43M TNI ANGKATAN LAUT (KPC 43M TNI AL)
Principal Dimensions
Length Over All (LOA) : 44.00 M
Breadth (B) : 7.40 M
Depth (H) : 3.40 M
Draft (T) : 1.70 M
Class : Biro Klasifikasi Indonesia (BKI)

The next project that I deal with are 1 Unit Patrol Boat Ship KPC 43M, Owner by. TNI Angkatan Laut. Each vessel using 3 Main Engines MAN 1800 HP 2300 rpm. All boat construction is made of carbon steel material.



"Back View KPC 43M"


"Side View KPC 43M"


"Front Left View KPC 43M"





Rabu, 16 April 2014

History of My Work

Starting From a Not Yet Understood Be To Know & Understand

Hai, nice to meet you :)
My Name is "PUTRA IS DEWATA"
You can call me Putra / Ata'.

I want to introduce my job place,

PT. CAPUTRA MITRA SEJATI Shipyard and Shipbuilder (PT. CMS)
This is my work place since 2011, the company location is in
HEAD OFFICE :
JL. K.H Hasyim Ashari No. 2, Central Jakarta 10130, Indonesia

The Shipyard is located in Merak-Serang, province of Banten,
Jl. Perbatasan Ds. Salira Ds. Mangunreja Kec. Pulo Ampel, Serang Banten, Indonesia.

The picture below is the location where I work, I got a lot of experience, ranging from science related to college until time management system. Facilities for stell work available are "Fabrication area, Cutting equipment, Plasma cutting, Press break / Bending tool, Drilling equipmnet, Built Up H- Beam". At shipyard facilitiy are "Slipway, Transfer car, Sausage air bag, Main shed, Open space area". 


 "Open Space Area for Docking Ship"




"Main Shed / Workshop Area and Transfer Car"

At site, I was in the office 3 to complete all the work. If there is a problem in this place we hold regular meetings every week. All is not possible if there are no problems, all the problems of any kind, as long as we still want to keep trying to find a solution path will be resolved.  



"At Office 3"


The picture below is when I was in the area Workshop 2. Progress is being made ​​here to project type Crew Boat Ship PM 18 & 19. All material made of aluminum. 


"At Workshop 2"



I was out on a crane, to see the progress of the development of shipbuilding Well Testing Barge. Ship building do in the area open space.


"At Open Space Area for Docking Ship"